Tuesday, July 16, 2024

Comments to Nuclear Regulatory Commission About Wyoming Nuclear Reactor

For  purposes (paper attached) I need to know: 
1. The annual metric weight of high level waste produced by each replica of this 345 MW plant;
2. The amount of water expected to be annually drawn from the Naughton Reservoir;
3. A description of plant’sthe load-following or load-balancing characteristics; and
4. Physical space required for one to five reactors. 

John B Driscoll
Candidate Montana U.S. House District 2
30 South Davis Street
Helena, MT 59601


No comments:

Post a Comment