1. The annual metric weight of high level waste produced by each replica of this 345 MW plant;
2. The amount of water expected to be annually drawn from the Naughton Reservoir;
3. A description of plant’sthe load-following or load-balancing characteristics; and
4. Physical space required for one to five reactors.
John B Driscoll
Candidate Montana U.S. House District 2
30 South Davis Street
Helena, MT 59601
2. The amount of water expected to be annually drawn from the Naughton Reservoir;
3. A description of plant’sthe load-following or load-balancing characteristics; and
4. Physical space required for one to five reactors.
John B Driscoll
Candidate Montana U.S. House District 2
30 South Davis Street
Helena, MT 59601
No comments:
Post a Comment